← All Results
Domain History

msprojects.lt

Grade F · 0/100 · 0/6 security headers present

Security Score

F
0/ 100

Security Headers

0/ 6

CSP Violations

NoViolations
Error 404: CSP not found, violations not found

Issues Found

0Issues

Recommendations

0Available

CSP Analysis

!No Content Security Policy Detected

This site does not set a Content-Security-Policy HTTP header. Without CSP, browsers allow all inline scripts, eval(), and resources from any origin, leaving the site vulnerable to Cross-Site Scripting (XSS) attacks.

Security Headers

✗Permissions-PolicyMissing

Restricts which browser features (camera, microphone, geolocation) the page can use, limiting attack surface.

How to add it:

nginx
add_header Permissions-Policy "camera=(), microphone=(), geolocation=()" always;
apache
Header always set Permissions-Policy "camera=(), microphone=(), geolocation=()"
cloudflare
Rules > Transform Rules > HTTP Response Header Modification > Set Permissions-Policy value
✗Referrer-PolicyMissing

Controls how much referrer information is sent with requests, preventing data leaks to third parties.

How to add it:

nginx
add_header Referrer-Policy "strict-origin-when-cross-origin" always;
apache
Header always set Referrer-Policy "strict-origin-when-cross-origin"
cloudflare
Rules > Transform Rules > HTTP Response Header Modification > Set Referrer-Policy to "strict-origin-when-cross-origin"
✗Strict-Transport-SecurityMissing

Forces browsers to use HTTPS for all future requests, preventing man-in-the-middle attacks and SSL stripping.

How to add it:

nginx
add_header Strict-Transport-Security "max-age=31536000; includeSubDomains; preload" always;
apache
Header always set Strict-Transport-Security "max-age=31536000; includeSubDomains; preload"
cloudflare
SSL/TLS > Edge Certificates > Enable HSTS (toggle on, set max-age to 12 months, enable includeSubDomains)
✗X-Content-Type-OptionsMissing

Prevents browsers from MIME-sniffing responses away from the declared Content-Type, blocking drive-by downloads.

How to add it:

nginx
add_header X-Content-Type-Options "nosniff" always;
apache
Header always set X-Content-Type-Options "nosniff"
cloudflare
Rules > Transform Rules > Managed Transforms > Enable "Add X-Content-Type-Options header"
✗X-Frame-OptionsMissing

Prevents the page from being embedded in iframes, protecting against clickjacking attacks.

How to add it:

nginx
add_header X-Frame-Options "DENY" always;
apache
Header always set X-Frame-Options "DENY"
cloudflare
Rules > Transform Rules > HTTP Response Header Modification > Set X-Frame-Options to "DENY"
✗X-XSS-ProtectionMissing

Legacy XSS filter for older browsers. Modern browsers use CSP instead. Set to "0" to avoid false positives.

How to add it:

nginx
add_header X-XSS-Protection "0" always;
apache
Header always set X-XSS-Protection "0"
cloudflare
Rules > Transform Rules > HTTP Response Header Modification > Set X-XSS-Protection to "0"

6 recommended security headers are missing on msprojects.lt.

Beyond headers: infrastructure exposure

via OSN, our sister project

Security headers protect the browser. OSN maps what's exposed underneath — servers, open ports, known CVEs, DNS and WHOIS.

See what the internet sees about msprojects.ltWeak headers often come with other exposure — check the full picture.

msprojects.lt

2 scans since 7/16/2025

F

Latest: 0/100

Total Scans

2

Latest Score

0/100

First Scan

7/16/2025

Last Scan

7/16/2025

Scan History

DateScoreCSPHeadersIssuesAction
Jul 16, 2025
F (0)
No
0/60View →

Show off your security grade

Embed this badge on your site or README. It updates automatically after each scan and links back to this report.

HeaderTest security grade: F (0/100) for msprojects.lt
HTML
<a href="https://headertest.com/results/msprojects.lt" title="Security headers grade for msprojects.lt — HeaderTest">
  <img src="https://headertest.com/api/badge/msprojects.lt" alt="HeaderTest security grade: F (0/100) for msprojects.lt" />
</a>
Markdown
[![HeaderTest security grade: F (0/100) for msprojects.lt](https://headertest.com/api/badge/msprojects.lt)](https://headertest.com/results/msprojects.lt)